Skip to main content


Icon Legend
This session is not in your schedule.
This session is in your schedule. Click again to remove it.

  • Monday, Sep 22nd
    3:30 PM – 4:00 PM ET
    CS9A - Concurrent Session 09A: Safeguarding Communities and Agriculture: Tule River Spillway Enlargement
    Presenter: Ike Pace, P.E. – Tetra Tech, Inc
    Co-Presenter: Mostafa Mostafa Mostafa, P.E. – US Army Corps of Engineers
    Environmental IssuesPublic Safety at DamsGeneral Dam Safety or Levee PolicyGeneral Case Studies
  • Monday, Sep 22nd
    5:00 PM – 6:30 PM ET
    PLT11 - Effect of lime-treatment on earthen embankment failure processes
    Poster Presenter: Daniel Livsey, Ph.D. – USDA - ARS
    Poster Co-presenter: Bryan Heiner, M.S. – USDA - ARS
    Poster Co-presenter: Sherry Hunt, PhD, P.E. – USDA - ARS
    Dam Failures and IncidentsEnvironmental IssuesGeneral Case Studies
  • Monday, Sep 22nd
    5:00 PM – 6:30 PM ET
    PLT19 - Modifying Existing Low-Head Dams to Fish Passable Rock Rapids
    Poster Presenter: Samuel Prentice, P.E. – GEI Consultants
    Dam RemovalEnvironmental IssuesPublic Safety at DamsRegulatory Program IssuesFundingNew and Emerging TechnologiesClimate Change
  • Monday, Sep 22nd
    5:00 PM – 6:30 PM ET
    PLT30 - Restoration and Innovation: The FishPass project on the Boardman-Ottaway River
    Poster Presenter: Megan Schroeder, EIT – AECOM
    Poster Co-presenter: Jason Plum, P.E. – AECOM
    Poster Co-presenter: Daniel Zielinski, Ph.D., P.E., M.ASCE – Great Lakes Fishery Commission
    Dam RemovalEnvironmental IssuesNew and Emerging Technologies
  • Monday, Sep 22nd
    5:00 PM – 6:30 PM ET
    PLT31 - Sediment Management at Versailles Lake Dam, Indiana Using Historical Bathymetric Data
    Poster Presenter: Elizabeth Johnson – Stantec
    Dam RemovalEnvironmental IssuesGeneral Dam Safety or Levee PolicyGeneral Case Studies
  • Monday, Sep 22nd
    5:00 PM – 6:30 PM ET
    PLT41 - Unlocking Insights: Assessing State Approaches to Dam Removal
    Poster Presenter: Katherine Schmidt, MS Env. Studies – American Rivers
    Poster Co-presenter: Brian Graber – American Rivers
    Dam RemovalEnvironmental IssuesRegulatory Program IssuesGeneral Case Studies
  • Monday, Sep 22nd
    5:00 PM – 6:30 PM ET
    PLT45 - Willisburg Lake Dam Spillway Design – The Importance of a Multi-Faceted Design Approach
    Poster Presenter: Jesse M. Pope, PE, CFM – Stantec
    Poster Co-presenter: Glen Alexander, P.E. – Kentucky Division of Water
    Poster Co-presenter: Dhaivat Patel, P.E. – Stantec
    Poster Co-presenter: Robert Hatton, P.E. – Stantec
    Environmental IssuesGeneral Dam Safety or Levee PolicyGeneral Case StudiesNew and Emerging Technologies
  • Tuesday, Sep 23rd
    1:30 PM – 2:00 PM ET
    CS18A - Concurrent Session 18A: Hamilton Dam Removal - Innovative Design and Collaboration to Achieve a Wide Variety of Objectives
    Dam RemovalEnvironmental IssuesPublic Safety at DamsRegulatory Program IssuesGeneral Dam Safety or Levee PolicyFundingNew and Emerging Technologies
  • Tuesday, Sep 23rd
    2:30 PM – 3:00 PM ET
    CS18C - Concurrent Session 18C: Thompson Mill Dam Removal - The Intersection of Community Resilience, Environmental Restoration and Public Safety
    Presenter: Manuela Johnson, CEM – Christopher B. Burke Engineering, LLC
    Dam RemovalEnvironmental IssuesPublic Safety at DamsRegulatory Program Issues
  • Tuesday, Sep 23rd
    3:30 PM – 3:45 PM ET
    CS25A - Concurrent Session 25A: A Comparison of Trencher Method vs. Slurry Trenching and Soil Mixing for Seepage Barriers in Dams
    Presenter: Charlie Krug – Geo-Solutions, Inc.
    Dam Failures and IncidentsEnvironmental IssuesGeneral Dam Safety or Levee PolicyGeneral Risk PoliciesGeneral Case Studies
  • Wednesday, Sep 24th
    8:30 AM – 9:00 AM ET
    CS29A - Concurrent Session 29A: Midwestern Dam Rehabilitation with Artesian Conditions… What could go wrong?
    Presenter: Matthew R. Marquis, P.E. – Ohio Department of Natural Resources
    Co-Presenter: Michael Becker, P.E. – Ohio Department of Natural Resources
    Environmental IssuesSecurity Programs and Protective MeasuresInspection of DamsPublic Safety at DamsGeneral Dam Safety or Levee PolicyGeneral Case Studies
  • Wednesday, Sep 24th
    4:30 PM – 5:00 PM ET
    CS36C - Concurrent Session 36C: The Reconstruction of Clam Falls Dam: Upgrading and Repurposing a Century-Old Hydropower Facility to Meet Contemporary Demands
    Presenter: Ethan Smith, P.E. – Ayres Associates
    Co-Presenter: Austin Rieder, P.E. – Ayres Associates
    Environmental IssuesGeneral Case Studies