CS26A - Concurrent Session 26A: 130th Anniversary of the Bouzey Dam Failure –The Importance of Internal Uplift Pressure in Stability Design of Gravity Dams
CS28A - Concurrent Session 28A: Probabilistic Flood Model to Evaluate Hydrologic Loadings and Evaluate the Operational Conservatisms of the PMP/PMF, An Owners Perspective
Environmental IssuesSecurity Programs and Protective MeasuresInspection of DamsPublic Safety at DamsGeneral Dam Safety or Levee PolicyGeneral Case Studies
9:00 AM – 9:30 AM ET
CS29B - Concurrent Session 29B: Application of RCC for Small Dam Projects - Rehabilitation of Rawson Hill, Bear Creek and Beaver Creek Dams
CS35A - Concurrent Session 35A: Development of a Screening Level Risk Assessment Tool: Risk Prioritization for 220 High and Significant Hazard Dams in Michigan
General Dam Safety or Levee PolicyGeneral Risk PoliciesFunding
3:30 PM – 5:00 PM ET
Concurrent Session 36 - Rehabilitation Case Histories
3:30 PM – 5:00 PM ET
Rehabilitation Case Histories
3:30 PM – 4:00 PM ET
CS36A - Concurrent Session 36A: From Severe Deterioration to a “Butte”: Rehabilitating an 1890s Dam with Post-Tensioned Anchor Bars and a Concrete Overlay
CS36C - Concurrent Session 36C: The Reconstruction of Clam Falls Dam: Upgrading and Repurposing a Century-Old Hydropower Facility to Meet Contemporary Demands